Skip to main content

Recently Updated Pages

4.10 Antenna gain

4 Example of calculations

For simplification, we consider that the Victim link receiver and the Interfering link transmitte...

Updated 1 month ago by ECO TECH

4.9 Power Control

4 Example of calculations

Note: The power control is used only in this section. When considering other sections, the power ...

Updated 1 month ago by ECO TECH

4.8 Protection distance

4 Example of calculations

If a minimum protection distance  between the victim link receiver and interfering link transmitt...

Updated 1 month ago by ECO TECH

4.7.2 "None" mode

4 Example of calculations 4.7 Uniform distribution of ILT vs VLR

When you select the “None” mode (see ANNEX 13:), he can also define a Uniform density of terminal...

Updated 1 month ago by ECO TECH

4.7.1 Uniform density mode - simulation radius calculation

4 Example of calculations 4.7 Uniform distribution of ILT vs VLR

The number of active transmitters that will be uniformly located within the simulation radius is...

Updated 1 month ago by ECO TECH

4.6 Simulation radius (ILT-VLR)

4 Example of calculations

The distance between the Victim link receiver and the Interfering link transmitter is referred to...

Updated 1 month ago by ECO TECH

4.5 Coverage radius (VLR-VLT)

4 Example of calculations

In this section the Free Space Model is used to derive the attenuation on the different paths and...

Updated 1 month ago by ECO TECH

4.4 iRSSoverlaoding

4 Example of calculations

The following graphics presents the input parameters to activate when the overloading mechanism i...

Updated 1 month ago by ECO TECH

4.3 iRSSintermodulation

4 Example of calculations

The following graphics presents the input parameters to activate when the intermodulation mechani...

Updated 1 month ago by ECO TECH

4.2.3 Protection ratio

4 Example of calculations 4.2 iRSSblocking

This mode is identical to the “sensitivity” mode since the only difference is that the Blocking v...

Updated 1 month ago by ECO TECH

4.2.2 Sensitivity mode

4 Example of calculations 4.2 iRSSblocking

In this calculation mode the function blockMax Interf Signal (Df) that you entered represents the...

Updated 1 month ago by ECO TECH

4.2.1 User-defined mode

4 Example of calculations 4.2 iRSSblocking

In this case, the Blocking is provided in dB and represents the attenuation of the receiver at a ...

Updated 1 month ago by ECO TECH

Intro

4 Example of calculations 4.2 iRSSblocking

For this exercise, the blocking response from the receiver has a positive sign as shown in Figure...

Updated 1 month ago by ECO TECH

4.1 iRSSunwanted

4 Example of calculations

The following parameters should be changed in the simulation: (i) the interferer operates at 1000...

Updated 1 month ago by ECO TECH

3.6.3 Example of probability of interference calculation

3 Example of running a simulation 3.6 Calculating the probability of inte...

The protection criteria to be used for the calculation of the probability of interference and the...

Updated 1 month ago by ECO TECH

3.6.2 Translation calculation mode

3 Example of running a simulation 3.6 Calculating the probability of inte...

When the Translation mode is chosen, it is possible to calculate and display a chart of the proba...

Updated 1 month ago by ECO TECH

3.6.1 Compatibility calculation mode

3 Example of running a simulation 3.6 Calculating the probability of inte...

It is then possible to derive the C/I (i.e. dRSS/iRSS equivalent to dRSS-iRSS in dB): dRSS/iRSS =...

Updated 1 month ago by ECO TECH

Objective

3 Example of running a simulation 3.6 Calculating the probability of inte...

  After the simulation of all events has completed, SEAMCAT will have calculated and ...

Updated 1 month ago by ECO TECH

3.5 Extract results vectors (dRSS, iRSS etc...)

3 Example of running a simulation

You can extract the dRSS vectors from the “Results” panel in the newly create workspace results i...

Updated 1 month ago by ECO TECH

3.4 Launching a simulation

3 Example of running a simulation

A simulation is now ready to be launched. It should be noted that prior to beginning the simulati...

Updated 1 month ago by ECO TECH