Skip to main content

Recently Updated Pages

12.3.4 Overloading results

12 Results 12.3 Generic model Results

As a result of the equation described in Annex A5.4, for each event and at each frequency, the su...

Updated 2 weeks ago by ECO TECH

12.3.3 Intermodulation results

12 Results 12.3 Generic model Results

iRSS intermodulation folder (Figure 248) with as many iRSSintermod vector for each combinatory co...

Updated 2 weeks ago by ECO TECH

12.3.2 Calculated radius

12 Results 12.3 Generic model Results

The calculated radius folder contains the values of the coverage and/or simulation radii calculat...

Updated 2 weeks ago by ECO TECH

12.3.1 Generated signals results

12 Results 12.3 Generic model Results

dRSS folder (‎ANNEX 4:) with dRSS vector; iRSS unwanted folder (‎ANNEX 5:) with as many iRSSu...

Updated 2 weeks ago by ECO TECH

Introduction

12 Results 12.3 Generic model Results

After running a simulation with generic system, each of these signals is displayed with indicated...

Updated 2 weeks ago by ECO TECH

12.2 Overview of output results

12 Results

Table 51: Interference criteria summary for various victim systems Victim system Intere...

Updated 2 weeks ago by ECO TECH

12.1.4 Cellular system outline

12 Results 12.1 Scenario outline

Once SEAMCAT has determined the number of UEs per cell either through simulation of optimal capac...

Updated 2 weeks ago by ECO TECH

12.1.3 Generic system outline

12 Results 12.1 Scenario outline

During the event generation all involved transceivers (ILT, ILR, VLR and VLT) are plotted in grap...

Updated 2 weeks ago by ECO TECH

12.1.2 Simulation status

12 Results 12.1 Scenario outline

The progress bar (right of Figure 242) reflects the percentage of events simulated with respect t...

Updated 2 weeks ago by ECO TECH

12.1.1 Simulation Summary

12 Results 12.1 Scenario outline

The simulation summary (left of Figure 242) provides a quick access to the mean, median and stand...

Updated 2 weeks ago by ECO TECH

Groups on Signal

Chat System Signal Chat

ECO are the custodian of PT and WG groups on Signal. When a chat group associated with a CEPT po...

Updated 3 weeks ago by ECO TECH

Member administration

Chat System Signal Chat

As a Chair in a group, you are also co-responsible to maintain the memberlist in the chat. This i...

Updated 3 weeks ago by ECO TECH

11.4 Configuring an EPP

11 Event processing

The EPP can be configured as wanted for this particular simulations soon as it is loaded to the s...

Updated 3 weeks ago by ECO TECH

11.3 Loading an EPP to a simulation

11 Event processing

To use EPP in a simulation go to the event processing tab and click the plus sign (Figure 239). ...

Updated 3 weeks ago by ECO TECH

11.2 Event processing GUI

11 Event processing

The Event processing GUI consists of 2 main parts as shown in Figure 238. On the left hand side y...

Updated 3 weeks ago by ECO TECH

11.1 Event processing concept

11 Event processing

The Event Processing tab is the place in SEAMCAT where you can set the Event Processing Plugin (E...

Updated 3 weeks ago by ECO TECH

10.4.5 Propagation Model

10 Scenario 10.4 Interfering link transmitter to vi...

You can choose the suitable propagation model to be applied when calculating signal loss along th...

Updated 3 weeks ago by ECO TECH

10.4.4 Adjacent channel scenario - e.i.r.p. max. in-block limit

10 Scenario 10.4 Interfering link transmitter to vi...

In the case where the WSDs are not allowed to transmit in the same operating frequency as for the...

Updated 3 weeks ago by ECO TECH

10.4.3 Probability of failure

10 Scenario 10.4 Interfering link transmitter to vi...

This feature is input selectable (by default, it is de-activated).The probability of failure may ...

Updated 3 weeks ago by ECO TECH

10.4.2 Detection of threshold

10 Scenario 10.4 Interfering link transmitter to vi...

In relation to the spectrum sensing results, if this CR detect that a victim system is in the vic...

Updated 3 weeks ago by ECO TECH