Enhancing Clarity and Usability of ECC Deliverables
Guidance on drafting clear and usable ECC Reports
ECC Reports are tomust comply with the relevant template , including forboth the editorial partrequirements and all annexes. ECC ReportsDeliverables with multiple annexes and a high number of pages,pages can make processing and readability a real challenge,challenging, especially for outside readers not being involved in thetheir development.
It is important to note that ECC ReportsDeliverables provide the basis for the development ofof, or contain itself, regulatory measures and must therefore need to be soundsound, with clear conclusions,conclusions, agreed betweenupon by the members of the groups to the maximum extent possible.
Key Principles for ECC Deliverables
1. Reproducibility of Studies
2. studies SEAMCAT has been developedClarity and use should be promoted in the groups by this alleviating the difficulties to compare studies based on several methodologies and assumptions.Conciseness
It
3. Structure and Content
Best Practices for Drafting ECC Deliverables
InFor summaryChairs itand is recommended:Rapporteurs
- Ensure
that
theECCReportsDeliverables are draftedtakinginintoaccordanceaccountwith theguidance and indications provided in theECCReport template,template, both in terms of content andtheeditorial requirements. Please note the “For contributors” section below.
For Contributors
Support from the Office
that the ECC Reports includeare soundconcise, technicalreproducible, resultsand aligned with clear conclusions, agreed between the members at the maximum extent possible, that can be used as a solid basis for the development of the subsequentECC’s regulatory framework.
Final Notes
- These
guidelines apply to
limitalltheECCnumberdeliverables,ofincludingannexes,ECCavoidingDecisions,theECCinclusion of raw material from input documents. The main body of theRecommendations, ECC ReportsshouldandincludeCEPTaReports.
It is additionally noted that contributions to ECC Groups should be submitted using the templates. Otherwise, the proponents should be required to bring their contributions in the right format before they can be incorporated in the relevant ECC Deliverable.